Novaclair Post-Construction Cleaning

Tenant Improvement Cleaning While the Building Stays Open

Tenant improvement cleaning is post-construction cleaning for a suite that is being renovated inside a building that remains in use. The work is the same as in a new build, but the surrounding tenants, lobby, elevators and corridors mean dust, noise and access are managed more carefully.

Get a free tenant improvement quote

Describe the job and add your city. Free to request, no obligation.

All requests are handled through this form. Add as much detail as you can and we will get back to you fast.

The first priority is keeping dust inside the suite. That means sealed doorways or partitions, negative air where the project uses it, protected floors in corridors and cleaning of the route in and out. Other tenants and the property manager will notice dust in common areas faster than inside the suite.

Building rules often set the schedule. Freight elevators, loading dock bookings, insurance forms and after-hours access all have to be sorted before a crew shows up. A quote that ignores them often changes when the building manager responds.

What the work includes

  • Cleaning inside the suite in phases: rough, final and touch-up
  • HEPA vacuuming and damp wiping to control fine dust
  • Protecting and cleaning routes through corridors, lobbies and elevators
  • Removing dust barriers and cleaning the area where they stood
  • Cleaning restrooms, kitchens and common areas touched by the project
  • Coordination with the property manager on access, hours and elevator bookings
  • Debris removal through the approved route to the approved bin
  • A condition note on common areas before and after
Wiping new appliances in a new-build kitchen

Signs your TI project needs dust control and cleaning planning

01

Neighbouring tenants have complained about dust or noise

02

The property manager has issued rules on hours, elevators and deliveries

03

Corridors and lobbies show tracked-in dust

04

The suite shares ventilation with other tenants

05

A lease commencement or tenant move-in date is approaching

06

Your project involves demolition or concrete work next to occupied space

How the work goes, step by step

01

Share the building rules

Send the property manager's requirements for contractors, hours, elevators and insurance.

02

Plan dust control

The scope covers barriers, routes and what is cleaned outside the suite.

03

Written quote

Phases, hours and any after-hours rates are priced in writing.

04

Cleaning visits

Crews work to the building's schedule, keeping common areas clean.

05

Handover

The suite and the route are checked together with your superintendent or the property manager.

What changes the price

Suite size and finishes
Larger suites and more complex finishes take more time.
Dust control requirements
Sealed barriers, negative air and extra route protection add labour.
After-hours work
Evenings and weekends often cost more, but may be the only way to work in some buildings.
Elevator and dock access
Freight elevator limits and loading dock windows slow the work.
Building paperwork
Insurance certificates, passes and orientation sessions required by the building take time.
Read the cost guide →

What a good quote spells out

  • How dust is contained and what is cleaned in corridors and lobbies
  • Whether after-hours and weekend work is priced separately
  • What building paperwork the cleaning crew will provide
  • How elevator and dock bookings are handled
  • Who is responsible if the building complains about dust

Tenant Improvement: questions people ask

How is tenant improvement cleaning different from new construction cleaning?

The surrounding building is in use, so dust control, routes and hours are tighter, and the property manager's rules shape the schedule.

Does a TI project need a clean-room approach?

Not usually, but fine dust control matters. Barriers, HEPA vacuuming and protected routes are the practical standard.

Can cleaning happen during business hours?

Sometimes, depending on the building and the noise level. Many buildings require evenings or weekends for dusty work.

What paperwork does the building usually need?

Often proof of insurance, a list of workers and a schedule. Confirm with the property manager before the quote is finalised.

Construction Project Hitting Final Phases? Let's Schedule the Cleans.

Tell us about the project and add drawings, photos or your schedule if you have them. We review every request, and a specialist who serves your area follows up in writing with a phase plan and a free quote.

Request a free quote →